Ongoing engineering support for your facility — without hiring a full-time engineer or waiting on a new proposal every time a need comes up.
Open a pre-approved PO with VITOK and get discounted hourly rates for as-needed maintenance engineering support, troubleshooting, documentation updates, safety work, and small projects.
Is this you?
- Limited internal engineering capacity
- Small projects or facility updates that keep getting pushed back
- Documentation, drawings, or safety updates that need attention
- Controls, electrical, process, or mechanical issues that need quick support
- A facility team that needs reliable engineering help — but not a full-time hire
If you’ve ever thought,
“We need engineering support… but not a full-time engineer.,”
this program is built for you.
How it works:
- Open a PO: Set aside a pre-approved amount for engineering support.
- Call as needs come up: Use VITOK for troubleshooting, documentation, safety updates, controls support, and small projects.
- Move faster: Skip the repeated proposal and approval cycle.
- Save: Receive discounted hourly rates while the PO is active.
- No lock-in. No penalty: Use support when you need it. When the PO runs low, we’ll let you know
Use Your PO For:
Operations & Troubleshooting
- Controls / automation fixes
- Ladder logic tweaks
- Commissioning support
Compliance & Safety
- Arc flash updates
- NFPA 70B-related work
- Label/sticker updates
Docs & Drawings
- Update “as-built” drawings
- P&ID walkdowns
- 3D models & facility docs
Small Projects
- Pump sizing & specs
- Vendor bid support
- Scoping small improvements
No minimum monthly usage. No penalty. No long-term lock-in.
Your PO gives you access to discounted engineering support when you need it. Unused budget remains available with no minimum monthly usage requirement or penalty.
Common Ways Clients Use Vitok Support
- Troubleshoot a controls issue
- Update P&IDs or as-built drawings
- Review arc flash labels or safety documentation
- Scope a small improvement project
- Support vendor bids or equipment specifications
- Plan upcoming facility engineering priorities
